City
|
Year of origin of policy action plan
|
Inhabitants
|
Actions regarding decentralised CHP
|
|---|
|
Bochum
|
2009
|
373,000
|
Feasibility study: integration of small CHP (buildings) in the regional supply concept (‘virtual power plant’).
|
|
Bottrop
|
2011
|
116,000
|
Local heating grid Kirchhellen: construction of a CHP plant of 15,000 kW with local heating grid on the basis of renewable energies (biogas, wood).
|
|
Dortmund
|
2011
|
580,000
|
Potential study of utilising CHP units in private households and the commercial sector.
|
|
Block-heating station-‘Push’ in municipal properties.
|
|
Duisburg
|
2009
|
488,000
|
None.
|
|
Essen
|
2009
|
573,000
|
Integration of urban development contracts into town plans to regulate use of CHP.
|
|
Gelsenkirchen
|
2011
|
256,000
|
Block-heating station-‘Push’ in municipal properties.
|
|
Pilot project: ‘Extension of CHP’.
|
|
Local heating grid in interconnection (potential analysis for block heating stations).
|
|
Combination of geothermal energy and micro-CHP.
|
|
Oberhausen
|
2012
|
212,000
|
Heat supply in the form of heat contracting for private house owners.
|
|
Decentralised CHP for the local heating grid in Barmingholten.
|
|
Recklinghausen
|
2012
|
118,000
|
Extension of (renewable energy) CHP in the city area.
|
|
Witten
|
2013
|
98,000
|
‘Push’ for combined heat and power.
|